profesi

Cilowong Landfill Site (Draft KP-3)


20160521_074821.jpg

Cilowong landfill site operated using open dumping that has negative impacts on the environment and communities around the landfill. On January 15th 2009, landslide of garbage pile up rice fields belonging to local residents. After the landslide, landfill operated by controlled landfill system, wastes are be arranged, compacted, and covered with soil periodically. According to the planning, landfill will stop operating by 2019 with capacity 251.767 cubic meters wastes.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s